Release 5.0.27.3
Eclipse

Ricky Allman (12:23 AM):

  • Agent now requires Classic to be at minimum version of 4.1.226.
  • RavenDB must be upgraded to version 6.2.10.

Preview Feature

  • Report Subscriptions: Schedule reports for automatic email delivery (daily/weekly/monthly). Contact support@amscontrols.com to enable the preview.
  • Coil Return Tasks in Warehouse

New Features

  • Attribute based changeover times: Use the change in tooling and material attributes to determine a changeover time. Times are additive. For example, if gauge takes 5 minutes (from material) and finished width takes 10 minutes (from tooling code), the changeover will be 15 minutes. Times can also be different for explicit values. It can be configured to take 10 minutes for 12 gauge and 5 minutes for all other gauges.
  • New Report: XL Machine Configuration
  • Send operator messages from the dashboard.
  • Remote XL Lockout Control: Control machine lockout states directly from the dashboard. When activated, this remotely locks or unlocks a machine, overriding the physical lockout switch until it is manually cycled at the controller. Requires XL200 firmware version v5.94.00/v4.94.00 or greater.
  • Shape patterns now support machines where the material is not centered in the machine and axes that are manually moved. These can be configured by PCode/Tooling Code.

Improvements

  • Reports have a consistent header when printed.
  • Production Summary report has a better print view.
  • Production log is initially collapsed on the dashboard.
  • Export and Import now available for Loss Codes.
  • Selections from available jobs in the scheduler can be bulk deleted.
  • System Preferences can now set the company name, default delay code, tailout scrap code, and carry last delay forward settings.

Bug Fixes

  • Fixed some dashboard sizing regressions.
  • Shape solution errors were not showing up in the order list or scheduler.
  • Performance and stability improvements.
Model Version Released
Eclipse-Pro 5.0.27.3 10/6/2025