3011
XL2; Allow some Quality Audit Triggers to be delayed by a specified number of parts.
XL200

All of the triggers based off of changes in the current item, like Order Change, Item Change, PCode change ... etc Trigger prior to any production occuring on the next item or order. Setting the trigger to prevent run, in order to force the data entry, prevented the item they wanted measured, to be ran.

Several customers have asked to be able to Halt the line after the first piece of an Order, PCode change, Material Change ... etc. This will allow them to force an operator to measure and report characteristics of the first part produced, where as the currently the Trigger occurs and the line halts on the last part.

With the Exception of the Time Based, Part Based and Footage Based Triggers, all triggers now have a Part delay that defaults to zero for current operation. If set to a non-zero value, the trigger be delayed by the specified number of parts.

If a customer wants the last part of a PCode run measured they can configure the trigger delay to zero parts and the halt after to zero parts. If the customer wants the first part of a PCode run to be measured they can configure the trigger delay to 1 part and the halt after to zero parts.

Model Version Released
XL2OL 4.39.00 10/21/2016
XL2CL 4.39.00 10/21/2016
XL220OL 4.08.00 11/14/2016
XL2OL 3.76.00 10/21/2016
XL2CL 3.76.00 10/21/2016